Mobile Phone
+86 186 6311 6089
Call Us
+86 631 5651216
E-mail
gibson@sunfull.com

Factory wholesale Universal Wiring Harness - Customized Harness Wire Auto Electrical Wiring Harness Cable Assembly for Home Appliance – Sunfull Hanbecthistem

Short Description:


Product Detail

Company Advantage

Advantage Compared with the Industry

Product Tags

Related Video

Feedback (2)

With a positive and progressive attitude to customer's interest, our company continuously improves our product quality to meet the needs of customers and further focuses on safety, reliability, environmental requirements, and innovation of Electronic Thermostat For Refrigerator, Ntc Thermistor Temperature Sensor, Tco Thermal Cutoff, Our tenet is clear all the time: to deliver high quality product at competitive price to customers around the world. We welcome potential buyers to contact us for OEM and ODM orders.
Factory wholesale Universal Wiring Harness - Customized Harness Wire Auto Electrical Wiring Harness Cable Assembly for Home Appliance – Sunfull Hanbecthistem Detail:

Description

Product Name Customized Harness Wire Auto Electrical Wiring
Harness Cable Assembly for Home Appliance
Use Wire harness for refrigerator, freezer, ice machine
After Humid Heat Test Insulation Resistance ≥30MΩ
Terminal Molex 35745-0210, 35746-0210, 35747-0210
Housing Molex 35150-0610, 35180-0600
Adhesive tape Lead-free tape
Foams 60*T0.8*L170
Test 100% test before delivery
Sample Sample available
Terminal/Housing Type Customized
Wire Customized

Applications

Typical Applications:

- Refrigerator
- Freezer
- Ice Machine
- Electrical Stove
- Washing Machine

p-d-1

Why Are Wire Harnesses Assembled Manually?

Wire harness assembly process is one of the few remaining manufacturing processes that is more efficiently done by hand, rather than automation. This is due to the variety of processes that are involved in the assembly. These manual processes include:

Installing terminated wires in various lengths

Routing wires and cables through sleeves and conduits

Taping breakouts

Conducting multiple crimps

Binding the components with tape, clamps or cable ties

Because of the difficulty involved in automating these processes, manual production continues to be more cost-effective, especially with small batch sizes. This is also why harness production takes longer than other types of cable assemblies. Production can take anywhere from a few days to several weeks. The more complicated the design, the longer production time is required.

 

However, there are certain portions of pre-production that can benefit from automation. These include:

Using an automated machine to cut and strip the ends of individual wires

Crimping terminals on one or both sides of the wire

Plugging wires pre-fitted with terminals into connector housings

Soldering wire ends

Twisting wires


Product detail pictures:

Factory wholesale Universal Wiring Harness - Customized Harness Wire Auto Electrical Wiring Harness Cable Assembly for Home Appliance – Sunfull Hanbecthistem detail pictures

Factory wholesale Universal Wiring Harness - Customized Harness Wire Auto Electrical Wiring Harness Cable Assembly for Home Appliance – Sunfull Hanbecthistem detail pictures

Factory wholesale Universal Wiring Harness - Customized Harness Wire Auto Electrical Wiring Harness Cable Assembly for Home Appliance – Sunfull Hanbecthistem detail pictures


Related Product Guide:

We take pleasure in an extremely fantastic standing among the our prospects for our great product top quality, competitive cost and the finest support for Factory wholesale Universal Wiring Harness - Customized Harness Wire Auto Electrical Wiring Harness Cable Assembly for Home Appliance – Sunfull Hanbecthistem , The product will supply to all over the world, such as: Paraguay, Seychelles, Iceland, We've been adhering to the philosophy of "attracting customers with the best items and excellent service". We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.

办公楼1Our product has passed the CQC,UL,TUV certification and so on, has applied for patents accumulatively more than 32 projects and has obtained scientific research departments above the provincial and ministerial level more than 10 projects. Our company has also passed the ISO9001 and ISO14001 system certificated, and national intellectual property system certificated.

Our research and development and production capacity of the company’s mechanical and electronic temperature controllers have ranked in the forefront of the same industry in the country.7-1

  • The after-sale warranty service is timely and thoughtful, encounter problems can be resolved very quickly, we feel reliable and secure.
    5 Stars By Stephen from Zurich - 2018.05.15 10:52
    This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!
    5 Stars By Belle from Uruguay - 2018.09.08 17:09
    Write your message here and send it to us